shoping-cartYour cart is empty
    Sign In or Register



    Sign In Socially

    If you are a member of facebook or google or yahoo, you can login to our system by clicking on the icon below.


AXG010-CANF2BA1-AP114B-1JA12/SCT/L3/M01/CH New Yokogawa AXG Magnetic Flowmeter

AXG010-CANF2BA1-AP114B-1JA12/SCT/L3/M01/CH New Yokogawa AXG Magnetic Flowmeter

$5,887.00  $2,885.00
Save: 51% off


Part Number: AXG010-CANF2BA1-AP114B-1JA12/SCT/L3/M01/CH
Model: AXG Magnetic Flowmeter
Brand: Yokogawa
Condition: New & Original in Factory Packing
Factory Warranty: 12 Months

Model and Suffix Codes

Model AXG010 Magnetic Flowmeter (10 mm/0.4 in)
Use -C Explosion protection
Construction A Integral flowmeter
Explosion Protection NF2
Process connection BA1 Stainless Steel Flange (F304): ASME Class 150 Flange
Lining A PFA Lining
Electrode P Platinum-Iridium
Grounding Device 1 None
Housing and Coating 1 Standard Material with Standard Coating
Cable Entry 4 ISO M20×1.5 Female
Accuracy B Standard
Power Supply -1 100-240 V AC / 100-120 V DC
Communication and I/O JA #: A, B, C, D, E, F, G, H, J, K, P, Q, R, S, T HART 7 and I/O (Type A to K, P to T, See separate table)
Transmitter Wiring Terminal 1 M4 Screw-type
Display 2 With Display (English, Chinese)
Stainless Steel Tag Plate /SCT The pendant type tag plate (stainless steel 304) is wired around the flowmeter neck. Select optional code SCT when necessary in addition to that on the nameplate, on which the Tag No. is inscribed.
Plate size (Height x Width): Approx. 12.5 mm x 40 mm (4.92 in. x 15.7 in.)
Calibration Certificate (Level 3) /L3 The Declaration and the Primary Standard List are issued.
Material Certificate /L3 Material certificate is issued.
Target Parts:
PFA Lining: Measuring Pipe, Electrodes, Grounding Devices (Grounding Rings Plate Type, Grounding Rings Electrode Type, or Built-in Grounding Electrodes), Flanges (for flange type), Mini-flanges (for wafer type), Adapters for Hygienic
Ceramics Tube: Grounding Devices (Grounding Rings Plate Type, or Grounding Rings Electrode Type), Union Joint
/CH

NOTE: This item is a replacement of AXG010-CAKF2BA1-AP114B-1JA12/SCT/L3/M01


  • Estimated Lead Time: 8 - 9
  • Shipping Weight: 10 Kg

Add to Cart:

  • Model: AXG010-CANF2BA1-AP114B-1JA12/SCT/L3/M01/CH
  • 7 Units in Stock


Processing Time
  • Ships in 24 hours: Processing Time is guaranteed to be shorter than 24 hours.
  • Typical Processing Time: 3 - 12 days

We ship to over 200 countries worldwide!